Apron Replacement

Design/Bid/Build

109th Air Wing, Stratton ANGB, NY

$4,942,330.00

Project Description

The work for this project included the removal and replacement of approximately 45,000 sy of 11” Concrete Pavement for Airfields; 32,450 sy of Portland Cement Stabilized Subbase Course; 26,150 sy of Granular Drainage Base; Storm Drainage Piping and Structures including Glycol Storage Tanks; Electrical Ductbanks; and Taxiway Edge Lights.